The recently completed $136 million Nestle production facility in Dubai, has created synergies in warehousing and logistics, which will allow Nestlé to better serve the Middle Eastern region as a whole. Panel system supplier and installer, Tiger Profiles LLC utilised Proctor Groups reinforced vapor barrier, Procheck Premier 500 to protect the building from any ingress of vapor, mitigating any condensation issues within the fabric of the building.
Procheck Premier 500 combines excellent air and vapor barrier performance with a tough and durable reinforced structure. The reinforcement grid within the membrane resists damage during installation, ensuring a vapor resistant seal. This enables the building to perform as designed and maintain its energy efficiency, whilst providing robust protection from interstitial condensation throughout the life of the building.