One way to address this is to agree end performance criteria from the start of the project, before design even gets under way. If the desired outcome is, say, a low-carbon building, then contractual arrangements need to reflect that.

A contract based on meeting building regulations for the lowest price offers no incentive or additional fees for a contractor or developer to deliver more than the bare minimum.

Breaking specifications isn’t always about cost though. Sometimes there is an alternative product that the contractor finds easier to use or better to install.

Broken specifications and the performance gap

Whatever the cause, broken specifications represent a disconnect between a specifier aiming primarily for performance, and a contractor focusing on time and/or cost. Ultimately, they can lead to performance gaps being more likely in finished buildings.

If the distance between specification and installation isn’t bridged by contractual arrangements, then construction product manufacturers can step up to the plate by innovating and creating new solutions that meet the needs of both parties.

A real-world example of what we’re describing is the specification of sheathing boards for facade build-ups, together with our Wraptite® external air barrier.

Fibre cement vs gypsum-based sheathing boards

Traditional fibre cement sheathing boards offer a variety of benefits, and are frequently specified in conjunction with Wraptite. As a fully self-adhered airtightness membrane which is also vapour permeable, Wraptite allows the airtightness line to be moved to the external face of the structure.

In addition, its W1 classification for water holdout means it can provide temporary weather protection to the structure, without the need for tapes and sealants.

However, contractors have come to prefer gypsum-based sheathing boards to fibre cement. They are lighter – and therefore easier to handle, and easier to cut thanks to being score and snap.

When contractors break a fibre cement board specification, it’s not uncommon to see the accompanying Wraptite removed at the same time. Gypsum boards offer airtightness and weather protection benefits (with taping and sealing), but not to the same extent that Wraptite offers.

Contractors are choosing a sheathing board that is easier to handle, but which introduces extra processes to the installation – and which may reduce the level of performance intended by the specifier.

Manufacturing products that contractors want to use

In an effort to support specifiers and contractors, the A.Proctor Group has launched a new score and snap sheathing board called Proctor A1 Cement Board. To offer the best possible all-round solution, the new product combines the benefits of traditional fibre cement boards with the desirable qualities of newer gypsum sheathing boards.

Where fibre cement products are heavy and difficult to cut on site, Proctor A1 Cement Board is a contractor-friendly cementitious board that is both lightweight and, uniquely, score and snap.

Thanks to its excellent durability, the new sheathing board can be left exposed for longer periods. Taking into account Wraptite’s water holdout performance too, it means structural frames are protected even if project timelines are delayed across installation of the sheathing board and air barrier system.

Through-wall fire testing has been carried out on the new sheathing board with Wraptite, ensuring the compatibility of the two. As a cementitious product, Proctor A1 Cement Board is automatically classified as non-combustible. The testing delivered a result of 120 minutes without integrity failure, so customers can feel assured when choosing a fully-adhered, vapour permeable external air barrier.

The combination of Proctor A1 Cement Board and Wraptite is suitable for all projects, but in particular supports compliance with fire safety requirements for relevant buildings. It helps specifiers and contractors move more towards a system solution, backed up by third-party certification, comprehensive technical support, plus on-site support.

    • Material Sample icon

      Material Sample

    • Book a CPD icon

      Book a CPD

    • Virtual Meeting icon

      Virtual Meeting

    • U-Value Calculation icon

      U-Value Calculation

    • Specification Check icon

      Specification Check

    • CAD Detail Review icon

      CAD Detail Review

    Product Information